Precautions For Surveying and Leveling
- Bubble should be centered carefully and it should be re-checked continuously during survey.
- Tripod should be fixed at suitable height so that field officer can easily take the readings.
- Foot screws of the level should be fastened or tightened properly.
- Tripod legs should be properly adjusted in the ground soul.
- Pass on necessary instructions to the rod man before starting the survey.
- Rod man should be directed before start of survey that rod should always be kept in state.
- Staff rod should be checked before conducting the survey,so that it may not cause error.
- Survey should be preferably conducted in the morning or in the evening.
- Bench Mark should be established at proper and permanent places and their elevation should be marked, if possible.
- Ground should be leveled before taking the readings at turning point/change point and reading should be taken very carefully.
- Level should be handled and shifted carefully.
- Data like acre number,square meter and station distance should be carefully written on the field book.
- Level set should be handled and shifted very carefully.
- Survey must be closed.
- Level set equipment should be carefully packed after completing survey.
Javascript DisablePlease Enable Javascript To See All Widget
Post a Comment
Useful blog for study
surveying and levelling questions | Exam test